MU4 Aire Park, Leeds

After securing our second contract and the latest building on Aire Park, now named Kellstone, we successfully delivered 7,000 m2 of Grade A office space, and 650 m2 of flexible ground floor retail and leisure space. 

Main Contractor

Vastint

Contract Date

December 2024 – August 2025

SCS Contract Value

£1m

SCS Project Team

Dom Wright, Oliver Dove, Darren Friend

MU4 Aire Park, Leeds

Soffit insulation was secured to locations on the ground floor, comprising two layers of ultra soffit liner, secured to each other.

British Gypsum partitions predominantly formed the toilets; these incorporated a range of BG wall types from the Ground to Level 6.

IQIC ceiling systems installed to WC and corridor ceilings Ground to Level 6.

Installing SAS Ral grey rafts to communal and in front of the lifts from the ground to the 6th Floor

Contact Us.

Head Office:
Newmarket Mews
Aberford Road
Stanley
Wakefield. WF3 4AL

Head Office Tel:
0113 288 7111

General Enquiries:
enquiries@scs-north.com

Accounts Department:
accounts@scs-north.com

Key Contact:
Paul Flynn – Operations Director
paul@scs-north.com

SCS Group Newsletter

Register to receive news and industry updates.

SCS Building Solutions Ltd | Registered in England No. 2893518

Scroll to Top