The landmark project soars into the Manchester skyline, located in the Piccadilly Basin district. The 33 storey, 16 storey and 11 storey, 3 tower block scheme houses 369 high class one and two bedroom apartments, 12 three storey townhouses, a spa with a 25m pool, a fully equipped gym, spin and yoga studio. The building also hosts a cinema room and resident’s lounge.
Russells
July 2019 – November 2021
£4.1m
Christine Manley, Jim Armitage, Nick McDowell and Danny Harkin
Paul Flynn
Grant Pinder
Packages and materials used throughout the Project consisted of the following; Kingspan 150mm SFS with cement particle board lining.
Speedline metal and British Gypsum boarding throughout the apartment blocks.
Knauf Aquapanel system utilised for wall lining and ceilings to the pool area.
SAS systems 150, 200, 205, 320 and 330, installed throughout the corridors, high level reception, gym, health studios and leisure areas with specific locations of tricell black grid.
Head Office:
Newmarket Mews
Aberford Road
Stanley
Wakefield. WF3 4AL
Head Office Tel:
0113 288 7111
General Enquiries:
enquiries@scs-north.com
Accounts Department:
accounts@scs-north.com
Key Contact:
Paul Flynn – Operations Director
paul@scs-north.com
Register to receive news and industry updates.