Vinci were the main contractor that we engaged with to construct a vibrant Student Quarter linked to the main University Campus, at the University of Hull.
The accommodation features a range of 1,462 single rooms and one-bedroom apartments.
The complex comprises of nine blocks arranged around a central plaza at the top of a village street with a convenience store, central green and cafe.
Vinci
September 2017 – July 2019
£7.3m
Dave Millard, Alan Courts, Dom Wright, Ryan Jones
Trevor Watson
Trevor Watson
SCS packages included the internal partitions, drylining, plastering and encasement works. To accompany this, we also secured the ceilings packages in multiple locations.
The partitions were installed using a British Gypsum specification and the ceiling installation was an SAS system 105 and 205 product in the lobbies and corridors.
Head Office:
Newmarket Mews
Aberford Road
Stanley
Wakefield. WF3 4AL
Head Office Tel:
0113 288 7111
General Enquiries:
enquiries@scs-north.com
Accounts Department:
accounts@scs-north.com
Key Contact:
Paul Flynn – Operations Director
paul@scs-north.com
Register to receive news and industry updates.