SCS assisted our long-term client Graham Construction in supporting the University of York’s ‘Campus for the Future’ masterplan, by delivering a 1480-bed student accommodation project.
The £130m flagship scheme, is situated between the two campuses of Campus East and Campus West and comprises of 18 blocks that houses the en-suite bedrooms and 200 living rooms/kitchens plus socials Hubs across two buildings.
Grahams
July 2020 – January 2022
£3.8m
Steve Potts, Ryan Jones
Darren Friend
Ryan Jones
The main specification used to structure the accommodation blocks was installed using a Siniat full through wall system to all internal partition walls, drylining, linings, encasements, MF ceilings and bulkheads, including skim.
Fermacell boards and din studs utilised to specific locations.
SAS ceiling system 600 and Ecophon Focus D, with Ecophon acoustic rafts.
Head Office:
Newmarket Mews
Aberford Road
Stanley
Wakefield. WF3 4AL
Head Office Tel:
0113 288 7111
General Enquiries:
enquiries@scs-north.com
Accounts Department:
accounts@scs-north.com
Key Contact:
Paul Flynn – Operations Director
paul@scs-north.com
Register to receive news and industry updates.